Tenders for 2 elevated corridors cancelled again, re-floated same day: What changed

Tenders for 2 elevated corridors cancelled again, re-floated same day: What changed
October 29, 2026

LATEST NEWS

Tenders for 2 elevated corridors cancelled again, re-floated same day: What changed

A file photo of the Minerva Circle. The Minerva Circle corridor is estimated to cost ₹511.48 crore, compared with ₹539 crore in the previous tender. 
| Photo Credit: FILE PHOTO

The Bengaluru Smart Infrastructure Limited (B-SMILE) has once again cancelled tenders for two elevated corridor projects and reissued them on the same day with reduced estimated project costs.

In a notification issued on October 29, the B-SMILE said the two tenders had been cancelled due to technical reasons, as instructed by the competent authority, which is the Urban Development Department (UDD) in this case.

The cancelled and reissued tenders include the elevated corridor from Minerva Circle to Hudson Circle, a loop flyover from the Balagangadharanatha Swamiji flyover to Town Hall, and the elevated corridor from Anand Rao Circle to K.R. Circle. The second tender pertains to the elevated corridor from Sholay Circle to St. John’s Hospital on Hosur Road via Anepalya and Adugodi junctions.

Calls to Greater Bengaluru Authority (GBA) officials and B-SMILE Technical Director B.S. Prahallad seeking details of the “technical reasons” did not elicit a response.

However, a review of the tender documents revealed that the estimated project costs had been reduced. According to the documents, the Minerva Circle corridor is estimated to cost ₹511.48 crore, compared with ₹539 crore in the previous tender. The revised estimated cost of the Sholay Circle corridor is ₹515.28 crore, against the earlier estimate of ₹564 crore.

This is the second time the tenders have been cancelled within a month. Earlier, the tenders were called off after the Cabinet had approved the projects. The UDD had pointed out that the tenders followed a hybrid model and that prior approval for this had not been obtained. A committee that reviewed the tenders had also observed that the tender conditions might have restricted competition.

The development comes amid widespread criticism of the elevated corridor projects by citizens’ groups.

Published – October 29, 2026 09:00 pm IST

Share this post:

POLL

Who Will Vote For?

Other

Republican

Democrat

RECENT NEWS

Rajajinagar murders: Two more bodies recovered near Chamundi hills in Mysuru

Rajajinagar murders: Two more bodies recovered near Chamundi hills in Mysuru

‘Dimagi Naxals’ instigating people against Constitution and democracy: PM Modi as Maoists eliminated

‘Dimagi Naxals’ instigating people against Constitution and democracy: PM Modi as Maoists eliminated

Body of Punjab anti-drug activist Jhota brought to Mansa for last rites

Body of Punjab anti-drug activist Jhota brought to Mansa for last rites

Dynamic Country URL Go to Country Info Page