Technical flaws exposed in 161-B construction in Sangareddy district-Telangana Today

Technical flaws exposed in 161-B construction in Sangareddy district-Telangana Today
May 23, 2025

LATEST NEWS

Technical flaws exposed in 161-B construction in Sangareddy district-Telangana Today

The technical flaws in the construction of the road were exposed as the water stagnated at several places along the 46-km long highway which was built with an outlay of Rs 300 crore

Published Date – 23 May 2025, 08:11 PM




The technical flaws in the construction of the road were exposed as the water stagnated at several places along the 46-km long highway which was built with an outlay of Rs 300 crore

Sangareddy: Traffic flow was disrupted on NH-161B that connects Nizampet in Sangareddy and Bidar in neighbouring Karnataka state as heavy rain lashed these parts of the district on Thursday night.

The technical flaws in the construction of the road were exposed as the water stagnated at several places along the 46-km long highway which was built with an outlay of Rs 300 crore.

Several vehicles were stranded on the highway at Jagannathpur in Narayankhed mandal.

Some road users were seen pushing their car out of the water as it developed a technical glitch while wading through waist deep water.

Share this post:

POLL

Who Will Vote For?

Other

Republican

Democrat

RECENT NEWS

Long weekend likely to drive footfall to tourist sites in Karnataka

Long weekend likely to drive footfall to tourist sites in Karnataka

Sheena Bora murder case: SC grants 9 months extension to complete trial

Sheena Bora murder case: SC grants 9 months extension to complete trial

GHMC chief orders intensified mosquito eradication drive

GHMC chief orders intensified mosquito eradication drive

Dynamic Country URL Go to Country Info Page