A 2017 flood control master plan reveals that a Discaya-linked project along Cebu’s Cotcot river missed a vital engineering design
CEBU, Philippines – Along the downstream of Cebu’s Cotcot River, where families suffered heavy flooding during Typhoon Tino (Kalmaegi) in 2025, stands a flood control project with links to the country’s most controversial contractors — the Discayas.
A master plan made in 2017 reveals that the same project had left out a vital engineering design.
What went wrong and what did Rappler’s investigation reveal about Cebu’s flood control systems? Find out in this video explainer. – Rappler.com